Nissan Sentra B18 (2020-2025) Service Manual: Primary Pressure Solenoid Valve Circuit
Diagnosis Procedure
Diagnosis Procedure
-
CHECK HARNESS CONNECTOR
-
Ignition switch OFF.
-
Check the mating condition of TCM harness connector and CVT unit harness connector.
Is the inspection result normal?
YES >>GO TO 2.
NO >>Repair or replace damaged parts.
-
-
CHECK CONNECTOR TERMINAL
-
Disconnect TCM harness connector and CVT unit harness connector.
-
Check the connectors of TCM and CVT unit for water intrusion, or damage or corrosion of the terminals.
Is the inspection result normal?
YES >>GO TO 3.
NO >>Repair or replace damaged parts.
-
-
CHECK DETECTED DTC
Are other solenoid valve malfunctions detected in addition to primary pressure solenoid valve?
YES >>GO TO 4.
NO >>GO TO 7.
-
CHECK SOLENOID GROUND CIRCUIT - 1
-
Connect TCM harness connector.
-
Check continuity (resistance) between CVT unit harness connector terminal and ground.
CVT unit
—
Continuity (Resistance)
Connector
Terminal
F46
19
Ground
Existed (1 Ω or less)
Is the inspection result normal?
YES >>GO TO 6.
NO >>GO TO 5.
-
-
CHECK SENSOR GROUND CIRCUIT - 2
-
Disconnect TCM harness connector.
-
Check continuity (resistance) between TCM harness connector terminal and CVT unit harness connector terminal.
TCM
CVT unit
Continuity (Resistance)
Connector
Terminal
Connector
Terminal
F23
43
F46
19
Existed (1 Ω or less)
Is the inspection result normal?
YES >>GO TO 6.
NO >>Repair harness or connector.
-
-
CHECK TCM POWER SUPPLY AND GROUND CIRCUITS
Check TCM power supply and ground circuits. Refer to Diagnosis Procedure.
Is the inspection result normal?
YES >>INSPECTION END
NO >>Repair or replace damaged parts.
-
CHECK PRIMARY PRESSURE SOLENOID VALVE CIRCUIT - 1
Check continuity (resistance) between TCM harness connector terminal and CVT unit harness connector terminal.
TCM
CVT unit
Continuity (Resistance)
Connector
Terminal
Connector
Terminal
F23
40
F46
2
Existed (1 Ω or less)
Is the inspection result normal?
YES >>GO TO 8.
NO >>Repair harness or connector.
-
CHECK PRIMARY PRESSURE SOLENOID VALVE CIRCUIT - 2
Check continuity between TCM harness connector terminal and ground.
TCM
−
Continuity
Connector
Terminal
F23
40
Ground
Not existed
Is the inspection result normal?
YES >>GO TO 9.
NO >>Repair harness.
-
CHECK PRIMARY PRESSURE SOLENOID VALVE
Check resistance between CVT unit connector terminals.
CVT unit
Test condition
Resistance
Terminal
2
19
CVT fluid temperature
20°C (68°F)
5.0 – 5.6 Ω
50°C (122°F)
5.5 – 6.8 Ω
80°C (176°F)
6.0 – 8.0 Ω
Is the inspection result normal?
YES >>INSPECTION END
NO >>Replace control valve due to primary pressure solenoid valve malfunction. Refer to Removal and Installation.
Other materials:
Oil Filter
Removal and Installation
Removal and Installation
REMOVAL
Remove the
front under cover. Refer to Removal and Installation.
Using
suitable tool (A), remove the oil filter (1).
CAUTION:
Oil filter is provided with relief valve.
Be ...
Intelligent Key System
System Diagram
System Diagram
System Description
System Description
Signal name
Input
Output
Description
...
Fuel Injector
Component Function Check
Component Function Check
INSPECTION START
Turn ignition switch to START.
Are any cylinders ignited?
YES >>
GO TO
2.
NO >>
Refer to Diagnosis Procedure.
CHECK FUEL INJECTOR FUNCTION
...