Description
“B” terminal circuit supplies power to charge the battery and to operate the vehicles electrical system.
Diagnosis procedure
Regarding wiring diagram information. Refer to chg-9, "wiring diagram".
1.Check “b” terminal connection
Is the inspection result normal? Yes >> go to 2.
No >> repair terminal “b” connection. Confirm repair by performing complete charging system test using the exp-800 ni or gr8-1200 ni (if available). Refer to applicable instruction manual for proper testing procedures.
2.Check “b” terminal circuit
Check voltage between generator “b” terminal and ground.
Is the inspection result normal? Yes >> go to 3.
No >> check harness for open between generator and fusible link.
3.Check “b” terminal connection (voltage drop test)
Is the inspection result normal? YES >> “B” terminal circuit is normal. Refer to CHG-14, "Work Flow (With EXP-800 NI or GR8-1200 NI)" or CHG-17, "Work Flow (Without EXP-800 NI or GR8-1200 NI)".
NO >> Check harness between battery and generator for continuity.
Basic inspection
Diagnosis and repair workflow
Trouble diagnosis flow chart
Trouble diagnosis procedure
Interview with customer
Interview with the customer is important to detect the root cause of can
communication system errors and to
understand vehicle condition and symptoms for proper trouble diagnosi ...
Manual control
While using the Voice Recognition system, it is
possible to select menu options by using the
steering wheel controls instead of speaking voice
commands. The manual control mode does not
allow dialing a phone number by digits. The user
may select an entry from the Phonebook or Recent
Calls list ...
General maintenance
During the normal day-to-day operation of the
vehicle, general maintenance should be performed
regularly as prescribed in this section. If
you detect any unusual sounds, vibrations or
smells, be sure to check for the cause or have a
NISSAN dealer do it promptly. In addition, you
should notify ...