Nissan Sentra B18 (2020-2025) Service Manual: Power Supply and Ground Circuit
Diagnosis Procedure
Diagnosis Procedure
-
CHECK FUSE
-
Check that the following fuse is not blown:
Terminal No.
Signal name
Fuse No.
Capacity
40
Ignition signal
49
10 A
Is the fuse blown?
YES>>Replace the blown fuse after repairing the affected circuit.
NO>>GO TO 2.
-
-
CHECK POWER SUPPLY CIRCUIT
-
-
Ignition switch OFF.
-
Disconnect around view monitor control unit connector.
-
Ignition switch ON.
-
Check voltage between around view monitor control unit connector and ground.
Around view monitor control unit
—
Condition
Voltage
(Approx.)
Connector
Terminal
B72
40
Ground
Ignition switch: ON
Battery voltage
-
Is the inspection result normal?
YES >>GO TO 3.
NO >>Repair or replace harness or connectors.
-
-
CHECK GROUND CIRCUIT
-
-
Ignition switch OFF.
-
Check continuity between around view monitor control unit connector and ground.
Around view monitor control unit
—
Continuity
Connector
Terminal
B72
39
Ground
Yes
-
Is the inspection result normal?
YES >>Inspection End.
NO >>Repair or replace harness or connectors.
-
Other materials:
C1700-54 Control Unit
Dtc Description
DTC Description
Note:
The Signal Tech II Tool [– (NI-50190)] can be used
to perform the following functions: Refer to the Signal Tech II User
Guide for additional information.
Activate and display TPMS sensor IDs
Display tire pressure rep ...
U1300 Av Communication Circuit
Dtc Description
DTC Description
DTC DETECTION LOGIC
DTC No.
CONSULT screen terms
(Trouble diagnosis
content)
DTC detection condition
...
P0444 Evap Canister Purge Volume Control Solenoid Valve
Dtc Description
DTC Description
DTC DETECTION LOGIC
DTC
CONSULT screen terms
(Trouble diagnosis
content)
DTC detection
condition
...