Brakes
PrecautionSystem initialization
   Description
If any of the following operations are performed, the initialization is 
necessary for normal operation of power
window system.
	Disconnection and connection of battery cable from negative terminal.
	When power window main switch replaced.
	Electric power supply to power window m ...
   
Basic inspection
   Diagnosis and repair workflow
Work flow
Overall sequence
Detailed flow
1.Get information for symptom
Get detailed information from the customer about the symptom (the condition 
and the environment when the
incident/malfunction occurred).
>> Go to 2
2.Confirm the symptom
Try to ...
   
Filament
   Inspection and Repair
Inspection
	When measuring voltage, wrap tin foil around the top of the negative
	probe. Then press the foil against the wire with your finger.
	Attach probe circuit tester (in Volt range) to middle portion of
	each filament.
	If a filament is burned out ...