Preparation
Component partsPerformance test
Inspection
INSPECTION PROCEDURE
Connect recovery/recycling/recharging equipment (for HFC-134a) or
manifold gauge.
Start the engine, and set to the following condition.
Test condition
Maintain test condition until A/C system becomes stable. (Approximately
10 minutes)
Check t ...
Preparation
Special Service Tools
The actual shapes of Kent-Moore tools may differ from those of special
service tools illustrated here.
*: The O-ring as a unit part is set as a SST.
Commercial Service Tools
...
Unit removal and installation
TRANSMISSION ASSEMBLY
Exploded View
Transaxle assembly
O-ring
CVT fluid charging pipe
CVT fluid charging pipe cap
Tightening must be done following the installation procedure. Refer to
TM-283, "Removal and Installation".
: Always replace after every
disassemb ...