Diagnosis Procedure
1.Check connector
Is the inspection result normal? Yes >> go to 2.
No >> repair the terminal and connector.
2.Check harness for open circuit
Is the measurement value within the specification? Yes >> go to 3.
No >> repair the av control unit branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the av control unit. Refer to the following.
Is the inspection result normal? Yes (present error)>>replace the av control unit. Refer to the following.
Yes (past error)>>error was detected in the av control unit branch line.
No >> repair the power supply and the ground circuit.
Basic inspection
Diagnosis and repair work flow
Work flow
Overall sequence
Detailed flow
1.Get information for symptom
Get the detailed information from the customer about the symptom (the
condition and the environment when
the incident/malfunction occurred) using the “diagnostic work sheet”. ( ...
Rear power window motor
Removal and Installation
REMOVAL
Remove the rear door glass regulator (1). Refer to GW-21,
"Removal and Installation"
Remove the screws and the rear power window motor (2).
INSTALLATION
Installation is in the reverse order of removal. ...
Basic inspection
Diagnosis and repair workflow
Work Flow
Detailed flow
1.Interview from the customer
Clarify customer complaints before inspection. First of all,
perform an interview utilizing stc-20, "diagnostic
work sheet" and reproduce symptoms as well as fully understand it. Ask customer
abou ...