Diagnosis Procedure
1.Check connector
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.Check harness for open circuit

Is the measurement value within the specification? Yes >> go to 3.
No >> repair the tcm branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the tcm. Refer to tm-234, "diagnosis procedure".
Is the inspection result normal? Yes (present error)>>replace the tcm. Refer to the tm-263, "removal and installation".
Yes (past error)>>error was detected in the tcm branch line.
No >> repair the power supply and the ground circuit.
Ipdm-e branch line circuit
A-bag branch line circuitMain power window and door lock/ unlock switch
Removal and Installation
REMOVAL
Release the pawls using a suitable tool and lift the main power window
and door lock/unlock switch and
finisher as an assembly and remove.
Disconnect the harness connector from the main power window and door
lock/unlock switch.
Release the four pawls ...
Service
Never use electrical test equipment to check SRS circuits unless
instructed to in this Service Manual.
Before servicing the SRS, turn power switch OFF, disconnect battery
negative terminal and wait 3 minutes
or more.
For approximately 3 minutes after the cables are removed, it is stil ...
Tire pressure
Tire Pressure Monitoring System
(TPMS)
This vehicle is equipped with the Tire
Pressure Monitoring System (TPMS). It
monitors tire pressure of all tires except
the spare. When the low tire pressure
warning light is lit and the CHECK TIRE
PRES warning is displayed in the odometer,
one or more ...