Removal and InstallationPower supply and ground circuit
Combination meter
COMBINATION METER : Diagnosis Procedure
Regarding Wiring Diagram information, refer to MWI-28, "Wiring Diagram".
1.Check fuses
Check that the following fuses are not blown.
Is the fuse blown?
Yes >> replace the blown fuse after repairing the affected circu ...
Additional Service When Replacing 8ch Can Gateway
Work Procedure
Work Procedure
DESCRIPTION
When replacing 8CH CAN gateway, the following procedure must be
performed.
WORK PROCEDURE
SAVE 8CH CAN GATEWAY PART NUMBER
CONSULT Configuration
Read out the part number from the old 8CH CAN
gateway and save the ...
Trip Reset Switch
Exploded View
Exploded View
1.
Trunk lid opener switch
2.
ECO mode switch
3.
...