Nissan Sentra B18 (2020-2025) Service Manual: Power Supply and Ground Circuit
Diagnosis Procedure
Diagnosis Procedure
-
CHECK FUSE
-
Check that the following fuses are not blown:
Terminal No.
Signal name
Fuse No.
Capacity
1
Battery power supply
35
10 A
10
Ignition signal
48
10 A
Are the fuses blown?
YES >>Replace the blown fuse after repairing the affected circuit.
NO >>GO TO 2.
-
-
CHECK POWER SUPPLY CIRCUIT
-
-
Ignition switch OFF.
-
Disconnect TCU connector .
-
Check voltage between TCU connector and ground.
(+)
(-)
Condition
Voltage
(Approx.)
TCU
Connector
Terminal
M160
1
Ground
Ignition switch: OFF
Battery voltage
10
Ignition switch: ON
-
Is the inspection result normal?
YES >>GO TO 3.
NO >>Repair or replace harness or connectors.
-
-
CHECK GROUND CIRCUIT
-
-
Ignition switch OFF.
-
Check continuity between TCU connector and ground.
TCU
—
Continuity
Connector
Terminal
M160
28
Ground
Yes
29
-
Is the inspection result normal?
YES>>Inspection End.
NO>>Repair or replace harness or connectors.
-
Other materials:
Engine cooling system
The engine cooling system of the Nissan Sentra is factory-filled with a pre-diluted
mixture consisting of 50% Genuine NISSAN Long Life Antifreeze/Coolant (blue) and
50% water. This formulation is designed to provide reliable, year-round antifreeze
protection and effective engine cooling perfor ...
Roof. Dtc/circuit Diagnosis
Power Supply and Ground Circuit. Moonroof Motor Assembly
Moonroof Motor Assembly
Component Function Check
Component Function
Check
CHECK MOONROOF MOTOR FUNCTION
Check whether tilt up/down and slide open/close
functions operate with moonroo ...
Rear Side Air Bag Module. Removal and Installation
Removal and Installation
Removal and Installation
Warning:
Before servicing the SRS, place the ignition
switch in the OFF position, disconnect both battery terminals then
wait at least three minutes.
Do not use air tools or electric ...