CHECK FUSE
Check that the following fuse is not blown:
|
Signal name |
Fuse No. |
Capacity |
|---|---|---|
|
Ignition power supply |
49 |
10 A |
Is the fuse blown?
YES >>Replace the blown fuse after repairing the affected circuit.
NO >>GO TO 2.
CHECK FUSIBLE LINK
Check that the following fusible link is not blown:
|
Signal name |
Fusible link No. |
Capacity |
|---|---|---|
|
Battery |
H |
80 A |
Is the fusible link blown?
YES >>Replace the blown fusible link after repairing the affected circuit.
NO >>GO TO 3.
POWER SUPPLY CIRCUIT CHECK
Disconnect EPS control unit connector.
Check voltage between EPS control unit harness connector and ground.
|
(+) |
(—) |
Ignition switch position |
|||
|---|---|---|---|---|---|
|
EPS control unit |
|||||
|
Connector |
Terminal |
OFF |
ON |
START |
|
|
E74 |
7 |
Ground |
Battery voltage |
Battery voltage |
Battery voltage |
|
E73 |
4 |
0 V |
Battery voltage |
Battery voltage |
|
Is the inspection result normal?
YES >>GO TO 4.
NO >>Repair or replace harness or connector.
GROUND CIRCUIT CHECK
Ignition switch OFF.
Check continuity between EPS control unit harness connector and ground.
|
EPS control unit |
— |
Continuity |
|
|---|---|---|---|
|
Connector |
Terminal |
||
|
E74 |
8 |
Ground |
Yes |
Is the inspection result normal?
YES >>Inspection End.
NO >>Repair or replace harness or connectors.
Eps Warning LampConfirmation Procedure
Confirmation Procedure
PERFORM DTC CONFIRMATION
PROCEDURE
CONSULT
Erase DTC.
Ignition switch OFF.
Ignition switch ON.
...
Removal and Installation
Removal and Installation
REMOVAL
CAUTION:
Before servicing, turn the ignition switch OFF,
disconnect both battery terminals and wait at least three
minutes.
Do not use air or electric tools when removing or
installing the ...
Work Flow
Work Flow
OVERALL SEQUENCE
DETAILED FLOW
INTERVIEW CUSTOMER
Interview the customer to obtain as much information
as possible about the conditions and environment under which the malfunction
occurred.
...