NOTE:
This vehicle is diagnosed using the CONSULT-III plus.
Instrument lower panel LH

Function and System ApplicationPower generation voltage variable control system operation inspection
Diagnosis Procedure
Regarding wiring diagram information. Refer to chg-9, "wiring diagram".
Caution:
When performing this inspection, always use a charged battery that has
completed the battery inspection.
(When the charging rate of the battery is low, the response speed of the vol ...
Cylinder head
Exploded View
Cylinder head assembly
Cylinder head bolt
Cylinder head gasket
Refer to INSTALLATION
Removal and Installation
REMOVAL
Release fuel pressure. Refer to EC-143, "Work Procedure".
Drain engine coolant and engine oil. Refer to CO-12, "Changing En ...
Plug
Description
Replace the O-ring if oil leakage or exudes from the plug.
Exploded View
Plug
O-ring
O-ring
Plug
: Always replace after every
disassembly.
: NВ·m (kg-m, ft-lb)
: NВ·m (kg-m, in-lb)
: Genuine NISSAN CVT Fluid NS-3
Removal and Installation
NOTE:
Replace ...