Description
When the power window main switch is replaced, the initialization is necessary for normal operation of power window system.
CAUTION:
The following specified operations can not be performed under the non-initialized condition.
Work Procedure
1.SYSTEM INITIALIZATION
Perform system initialization. Refer to PWC-29, "Work Procedure".
>> GO TO 2.
2.CHECK ANTI-PINCH FUNCTION
Check anti-pinch function. Refer to PWC-30, "Work Procedure".
>> END
Compression pressure
Inspection
Warm up the engine to full operating temperature.
Release fuel pressure. Refer to EC-143, "Work Procedure".
Remove ignition coil and spark plug from each cylinder. Refer to EM-46,
"Exploded View".
Connect engine tachometer (not required in use of CONSULT). ...
P285A Clutch B Pressure
DTC Logic
DTC DETECTION LOGIC
DTC
CONSULT screen terms
(Trouble diagnosis content)
DTC detection condition
Possible causes
P285A
CLUTCH B PRESSURE
(Clutch B Pressure Disengagement
Performance)
The detection conditions continuously for 200
msec or more und ...
Basic inspection
Diagnosis and repair workflow
Work Flow (With GR8-1200 NI)
STARTING SYSTEM DIAGNOSIS WITH GR8-1200 NI
To test the starting system, use the following special service tool:
GR8-1200 NI Multitasking battery and electrical diagnostic station
NOTE:
Refer to the diagnostic station Instruction M ...