Nissan Sentra manuals

Nissan Sentra Service Manual: Seat belt buckle switch signal circuit

Description

Transmits a seat belt buckle switch lh (driver seat) signal to the combination meter

Component function check

1. Check combination meter input signal

Select data monitor for meter/m&a and check the buckle sw monitor value.

YES >> Inspection End.


YES >> Inspection End.

NO >> Refer to WCS-29, "Diagnosis Procedure".

Diagnosis procedure

Regarding wiring diagram information, refer to wcs-17, "wiring diagram".

1.Check combination meter input signal

  1. Turn ignition switch on.
  2. Check voltage between combination meter harness connector m24 terminal 9 and ground.

Is the inspection result normal?


Is the inspection result normal? Yes >> replace combination meter. Refer to mwi-77, "removal and installation".

No >> go to 2.

2.Check seat belt buckle switch circuit

  1. Turn ignition switch OFF.
  2. Disconnect combination meter harness connector m24 and seat belt buckle switch lh (driver seat) harness connector b16.
  3. Check continuity between combination meter harness connector m24 terminal 9 and seat belt buckle switch lh (driver seat) harness connector b16 terminal 1.


  1. Check continuity between combination meter harness connector m24 terminal 9 and ground.

Is the inspection result normal?


Is the inspection result normal?

Yes >> go to 3.

No >> repair or replace harness or connector.

3.Check seat belt buckle switch ground circuit

Check continuity between seat belt buckle switch lh (driver seat) harness connector b16 terminal 2 and ground.

Is the inspection result normal?


Is the inspection result normal? Yes >> check the seat belt buckle switch. Refer to wcs-30, "component inspection".

No >> repair or replace harness or connector.

Component inspection

1. Check seat belt buckle switch

  1. Turn ignition switch off.
  2. Disconnect the seat belt buckle switch lh (driver seat).
  3. Check continuity between the seat belt buckle switch lh (driver seat) terminals 1 and 2.

Is the inspection result normal?


Is the inspection result normal? Yes >> inspection end.

No >> replace the seat belt buckle switch lh (driver seat). Refer to sr-32, "removal and installation".

Meter buzzer circuit
Description The buzzer for warning chime system is installed in the combination meter. The combination meter sounds the alarm buzzer based on the signals transmitted from various units. ...

Symptom diagnosis
...

Other materials:

Glove box lamp
Removal and installation Warning: Do not touch bulb while it is lit or right after being turned off. Burning may result. Caution: Do not touch glass surface of the bulb with bare hands or allow oil or grease to get on it to prevent damage to bulb. Removal Remove the glove box assembly ...

Removal and installation
Ipdm e/r Exploded view Ipdm e/r Ipdm e/r cover a Ipdm e/r cover b Removal and installation Caution: Ipdm e/r integrated relays are not serviceable and must not be removed from unit. Removal Remove inlet air duct (upper). Refer to em-25, "removal and installation". ...

Front door finisher
Exploded View Front door panel Front door finisher Inside door handle escutcheon Main power window and door lock/ unlock switch finisher Door mirror corner finisher Grommet Clip Pawl Front NOTE: LH side shown; RH similar. Removal and Installation CAUTION: When ...

В© 2014-2026 Copyright www.nisentra.com