Exploded view

Removal and installation
Removal
Installation
Installation is in the reverse order of removal.
Reset electronic systems as necessary. Refer to pg-7, "additional service when removing battery negative terminal : special repair requirement".
Battery terminal with fusible link
Service data and specifications (SDS)Idle air volume learning
Description
Idle Air Volume Learning is a function of ECM to learn the idle air volume
that keeps each engine idle speed
within the specific range. It must be performed under any of the following
conditions:
Each time electric throttle control actuator or ECM is replaced.
Idle speed or i ...
Automatic speed control device (ASCD)
AUTOMATIC SPEED CONTROL DEVICE (ASCD) : Switch Name and Function
SWITCHES AND INDICATORS
CRUISE indicator
SET indicator*
CANCEL switch
ACCEL/RES switch
COAST/SET switch
ASCD MAIN switch
On the combination meter
On the steering wheel
*: Not applicable
Set speed range
A ...
Power supply routing circuit
Wiring Diagram — Battery Power Supply —
Wiring Diagram — Accessory Power Supply —
Wiring Diagram — Ignition Power Supply —
Fuse
If fuse is blown, be sure to eliminate cause o ...