PERFORM INITIALIZATION PROCEDURE
Initialization procedure is executed and operation is confirmed.
Refer to Work Procedure.
Is the inspection result normal?
YES>>Inspection End.
NO>>GO TO 2.
CHECK ENCODER CIRCUIT
Check encoder circuit.
Refer to DTC Diagnosis Procedure.
Is the inspection result normal?
YES>>GO TO 3.
NO>>Repair or replace the malfunctioning parts.
REPLACE MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH
Replace main power window and door lock/unlock switch. Refer to Removal and Installation.
Confirm the operation after replacement.
Is the result normal?
YES>>Inspection End.
NO>>Check intermittent incident. Refer to Intermittent Incident.
Door Motor
Exploded View
Exploded View
1.
Air mix door motor LH
2.
Heating and cooling unit
assembly
...
General maintenance
Explanation of general maintenance
General maintenance includes those items which should be checked during the
normal day-to-day operation
of the vehicle. They are essential if the vehicle is to continue operating
properly. The owners can perform
checks and inspections themselves or have thei ...
Rear Power Window Switch
Diagnosis Procedure
Diagnosis Procedure
CHECK FUSE
Ignition switch OFF.
Check that the following is not blown
(open):
...