Driver side
DRIVER SIDE : Description
Detects condition of the front power window motor lh operation and transmits to main power window and door lock/unlock switch as pulse signal.
DRIVER SIDE : Component Function Check
1. Check encoder operation
Check front door glass lh perform auto open/close operation normally with main power window and door lock/unlock switch.
Is the inspection result normal? Yes >> encoder operation is ok.
No >> refer to pwc-50, "driver side : diagnosis procedure".
DRIVER SIDE : Diagnosis Procedure
Regarding wiring diagram information, refer to pwc-18, "wiring diagram".
Encoder circuit check
1. Check encoder operation
Is the inspection result normal? YES >> Check intermittent incident. Refer to GI-39, "Intermittent Incident".
NO >> GO TO 2.
2. Check front power window motor lh power supply
Is the inspection result normal? YES >> GO TO 4.
NO >> GO TO 3.
3. Check harness continuity 1
Is the inspection result normal? YES >> Replace main power window and door lock/unlock switch. Refer to PWC-70, "Removal and Installation".
After that, refer to PWC-29, "Work Procedure".
NO >> Repair or replace harness or connectors.
4. Check ground circuit
Is the inspection result normal? Yes >> go to 6.
No >> go to 5.
5. Check harness continuity 2
Is the inspection result normal? YES >> Check main power window and door lock/unlock switch. Refer to PWC-36, "POWER WINDOW MAIN SWITCH : Component Inspection".
NO >> Repair or replace the harness or connectors.
6. Check harness continuity 3
Is the inspection result normal? Yes >> replace front power window motor lh. Refer to gw-16, "removal and installation". After that, refer to pwc-29, "work procedure".
No >> repair or replace harness or connectors.
DRIVER SIDE : Special Repair Requirement
1. Perform initialization procedure
Perform initialization procedure.
Refer to pwc-29, "work procedure".
Is the inspection result normal? Yes >> inspection end.
No >> check intermittent incident. Refer to gi-39, "intermittent incident".
Rear rh side power window does not operate
When both power window main switch and rear power window switch RH are
operated
When both power window main switch and rear power window switch rh are
operated : diagnosis procedure
1.CHECK REAR POWER WINDOW SWITCH RH
Check rear power window switch RH.
Refer to PWC-40, "REAR POWER WIN ...
Camshaft valve clearance
Inspection and Adjustment
INSPECTION
Perform inspection after removal, installation or replacement of camshaft or
valve-related parts, or if there are
unusual engine conditions regarding valve clearance.
Remove rocker cover. Refer to EM-46, "Exploded View".
Measure the valve cle ...
Removal and installation
EXHAUST SYSTEM
Exploded View
Sub muffler
Spring
Mounting rubber
Seal bearing
Catalyst shroud (upper)
Seal bearing
Exhaust front tube
Spring
Catalyst shroud (lower)
Clamp
Heated oxygen sensor 2
Ring gasket
Mounting rubber
Main muffler
Exhaust finisher (if equipped ...