Diagnosis procedure
1.Check connector
Is the inspection result normal? Yes >> go to 2.
No >> repair the terminal and connector.
2.Check harness for open circuit

Is the measurement value within the specification? Yes >> go to 3.
No >> repair the ecm branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the ecm. Refer to ec-164, "diagnosis procedure".
Is the inspection result normal? Yes (present error)>>replace the ecm. Refer to ec-485, "removal and installation".
Yes (past error)>>error was detected in the ecm branch line.
No >> repair the power supply and the ground circuit.
Main line between dlc and hvac circuit
Abs branch line circuitPreparation
Special Service Tools
The actual shapes of Kent-Moore tools may differ from those of special
service tools illustrated here.
*: The O-ring as a unit part is set as a SST.
Commercial Service Tools
...
Plug
Description
Replace the O-ring if oil leakage or exudes from the plug.
Exploded View
Plug
O-ring
O-ring
Plug
: Always replace after every
disassembly.
: NВ·m (kg-m, ft-lb)
: NВ·m (kg-m, in-lb)
: Genuine NISSAN CVT Fluid NS-3
Removal and Installation
NOTE:
Replace ...
Changing engine oil filter
Park the vehicle on a level surface and apply
the parking brake.
Turn the engine off.
Place a large drain pan under the oil filter C .
Loosen the oil filter with an oil filter wrench
by turning it counterclockwise. Then remove
the oil filter by turning it by hand.
CAUTION
Be c ...