Diagnosis Procedure
1.Check connector
Is the inspection result normal? YES >> GO TO 2.
NO >> Repair the terminal and connector.
2.Check harness for open circuit
Is the measurement value within the specification? Yes >> go to 3.
No >> repair the ecm branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the ecm. Refer to ec-164, "diagnosis procedure".
Is the inspection result normal? Yes (present error)>>replace the ecm. Refer to ec-485, "removal and installation".
Yes (past error)>>error was detected in the ecm branch line.
No >> repair the power supply and the ground circuit.
Ducts and grilles
Exploded View
Heating and cooling unit assembly
Center ventilator duct
Defroster duct
Side ventilator duct (LH)
Front floor duct (LH)
Rear floor connecting duct (LH)
Rear floor duct (LH)
Rear floor duct nozzle (LH)
Rear floor duct nozzle (RH)
Rear floor duct (RH)
Rear flo ...
P0327, P0328 KS
DTC Logic
DTC DETECTION LOGIC
DTC No.
CONSULT screen terms
(Trouble diagnosis content)
DTC detecting condition
Possible cause
P0327
KNOCK SEN/CIRC-B1
(Knock sensor 1 circuit
low bank 1)
An excessively low voltage from the knock sensor
is sent to ECM.
...
Wiring diagram
BCM
Wiring diagram
...