Service data and specifications (SDS)System initialization
Description
If any of the following operations are performed, the initialization is
necessary for normal operation of power
window system.
Disconnection and connection of battery cable from negative terminal.
When power window main switch replaced.
Electric power supply to power window m ...
Front disc brake
BRAKE PAD
BRAKE PAD : Inspection
PAD WEAR
Check brake pad thickness from an inspection hole on caliper body.
Check using a scale if necessary
Wear limit thickness : Refer to BR-55, "Front Disc
Brake".
DISC ROTOR
DISC ROTOR : Inspection
APPEARANCE
Check surface of disc rotor ...
Removal and installation
Combination meter
Exploded view
Combination meter
Front cover
Removal and installation
Removal
Remove cluster lid a. Refer to ip-19, "removal and installation".
Remove the screws from the combination meter.
Remove the combination meter.
Disconnect the comb ...