Description
When the power window main switch is replaced, the initialization is necessary for normal operation of power window system.
CAUTION:
The following specified operations can not be performed under the non-initialized condition.
Work Procedure
1.SYSTEM INITIALIZATION
Perform system initialization. Refer to PWC-29, "Work Procedure".
>> GO TO 2.
2.CHECK ANTI-PINCH FUNCTION
Check anti-pinch function. Refer to PWC-30, "Work Procedure".
>> END
Plug
Description
Replace the O-ring if oil leakage or exudes from the plug.
Exploded View
Plug
O-ring
O-ring
Plug
: Always replace after every
disassembly.
: NВ·m (kg-m, ft-lb)
: NВ·m (kg-m, in-lb)
: Genuine NISSAN CVT Fluid NS-3
Removal and Installation
NOTE:
Replace ...
Excessive abs function operation
frequency
Diagnosis Procedure
1.CHECK START
Check front and rear brake force distribution using a brake
tester.
Is the inspection result normal?
YES >> GO TO 2
NO >> Check brake system.
2.CHECK FRONT AND REAR AXLE
Make sure that there is no excessive play in the front and rear
axles. ...
Power supply and ground circuit
Combination meter
Combination meter : diagnosis procedure
Regarding Wiring Diagram information, refer to MWI-28, "Wiring Diagram".
1.Check fuses
Check that the following fuses are not blown.
Is the fuse blown?
YES >> Replace the blown fuse after repairing the affected circu ...