Nissan Sentra B18 (2020-2025) Service Manual: Power Generation Voltage Variable Control System Operation Inspection. Diagnosis Procedure
Diagnosis Procedure
Diagnosis Procedure
CAUTION:
When performing this inspection, always use a charged battery that has completed the battery inspection. (When the charging rate of the battery is low, the response speed of the voltage change will become slow. This can cause an incorrect inspection.)
-
CHECK IPDM E/R
-
CONSULTSelect “Self Diagnostic Result� mode of “IPDM E/R�. Refer to CONSULT Function (IPDM E/R).
Self-diagnostic results content
No malfunction detected>>GO TO 2.
Malfunction detected>>Check applicable parts, and repair or replace corresponding parts.
-
-
CHECK OPERATION OF POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM
-
CONSULT-
Start the engine.
-
The selector lever is in “P� or “N� position and all of the electric loads and A/C, etc. are turned OFF.
-
Select “ALTERNATOR DUTY� in “Active Test� mode of “ENGINE�, and then check the value of “BATTERY VOLT� monitor when DUTY value of “DUTY� is set to 40.0 %.
“BATTERY VOLT�
2 seconds after setting the DUTY value of “ALTERNATOR DUTY� to 40.0 %
: 12 - 13.6 V
-
Check the value of “BATTERY VOLT� monitor when DUTY value of “DUTY� is set to 80.0%.
“BATTERY VOLT�
20 seconds after setting the DUTY value of “ALTERNATOR DUTY� to 80.0 %
: +0.5 V or more against the value of “BATTERY VOLT� monitor when DUTY value is 40.0 %
-
Is the inspection result normal?
YES >>Inspection End.
NO >>GO TO 3.
-
-
CHECK ECM
-
CONSULTSelect “Self Diagnostic Result� mode of “ENGINE�. Refer to CONSULT Function.
Is the inspection result normal?
No malfunction detected>>GO TO 4.
Malfunction detected>>Check applicable parts, and repair or replace corresponding parts.
-
-
CHECK HARNESS BETWEEN GENERATOR AND ECM
-
-
Ignition switch OFF.
-
Disconnect generator connector and ECM connector.
-
Check continuity between generator harness connector and ECM harness connector.
Generator
ECM
Continuity
Connector
Terminal
Connector
Terminal
F15
2
F25
98
Yes
-
Check continuity between generator harness connector and ground.
Generator
—
Continuity
Connector
Terminal
F15
2
Ground
No
-
Is the inspection result normal?
YES>>Replace ECM. Refer to Removal and Installation.
NO>>Repair harness or connectors between ECM and generator.
-
Other materials:
Ecu Diagnosis Information. Tcu
Tcu
Values on the Diagnosis Tool
Values on the Diagnosis Tool
Note:
The following table includes information (items)
inapplicable to this Nissan Sentra vehicle. For information (items) applicable to
this vehicle, refer to CONSULT display items.
...
Rear Parcel Shelf Finisher
Exploded View
Exploded View
1.
Top tether strap anchor
finisher
2.
High-mounted stop lamp
...
Door Motor Circuit
Diagnosis Procedure
Diagnosis Procedure
Note:
If all of door motor DTCs are detected, check this
circuit.
CHECK DOOR MOTOR POWER SUPPLY
Ignition switch ON.
Check voltage between in ...