Removal and Installation
REMOVAL
INSTALLATION
Installation is in the reverse order of removal.
Precaution for Work
When removing or disassembling each component, be careful not to damage
or deform it. If a component
may be subject to interference, be sure to protect it with a shop cloth.
When removing (disengaging) components with a screwdriver or similar
tool, be sure to wrap the component
with a ...
Symptom diagnosis
Squeak and rattle trouble diagnoses
Work flow
Customer interview
Interview the customer if possible, to determine the conditions that exist
when the noise occurs. Use the diagnostic
worksheet during the interview to document the facts and conditions when the
noise occurs and any
custom ...
Diagnosis and repair workflow
Work Flow
OVERALL SEQUENCE
*1: Include 1st trip DTC.
*2: Include 1st trip freeze frame data.
DETAILED FLOW
1.GET INFORMATION FOR SYMPTOM
Get the detailed information from the customer about the symptom (the
condition and the environment when
the incident/malfunction occurred) using the ...